In the factory Sayyas man: Have you, have the spirit of striver


Sayyas was founded 25 years ago, adhering to the "customer-centric" values and striver culture, breaking through the industry barriers, becoming the leading enterprise in the door and window industry, and continuing to lead the development of China's energy-saving window industry. In the face of the severe and complex situation of three local epidemic containment this year, Sayyas actively responded to the call of superiors, Sayyas strivers stick together, carry their bags, fight in the production line, in the case of epidemic prevention and control is not lax, and strive to complete orders to ensure stable production.


In the factory Sayyas man: Have you, have the spirit of striver


According to incomplete statistics, from November 3 to now, a total of nearly 400 strivers in the factory. During the period, they not only become their own positions of versatile, versatile workers, a number of posts to play the maximum energy, and at any time to change into porters, chefs, for partners to solve the worries in life.


Once asked by a reporter the secret of his success, Jobs replied, "Love." Sayyas has maintained its growth despite the impact of several epidemics. It also has a word: struggle.



01 "Is a hub, but also a very ordinary resident staff"


In the factory Sayyas man: Have you, have the spirit of striver


There are eight colleagues in our department. Jianjie entered the factory as soon as possible after unsealing, organized meetings, coordinated orders, and urged raw materials, thus assuming the role of manufacturing hub. This time, I packed up and came to Shuangcheng in an emergency. In order to make plans, I didn't leave when I was allowed to go home over the weekend. I wanted to make plans as soon as possible. At night, I work overtime until the lights are turned off at 9 o 'clock. At 7 o 'clock in the morning, I immediately start my day's work after washing up. When the factory works overtime at night, the lights are bright, but the whole office building is always quiet, with the "click" of the keyboard of the partner in the order department and the sound of printing drawings. I feel that everything is running steadily, and I feel very secure in my heart.


During the epidemic period, the staff at the plant worked very hard and actively for the normal operation of the production line. We're just ordinary people, and we'll be there when the Sayyas needs us!


-- Wang Hongying, PMC Planning Engineer


02 The last mile of the relay


In the factory Sayyas man: Have you, have the spirit of striver


This epidemic, Yang Fei and I took the initiative to apply for the factory. Manager Zhang Shu and other partners provided remote assistance and managed the suppliers respectively. With the support of the whole department, they felt less lonely.


The great obstacle to procurement brought by the epidemic is the increase of transportation checkpoints. Yang Fei and I completed the "last kilometer" when the materials could not pass through the epidemic prevention checkpoints. With the assistance of the administrative partner, we rushed to Xinxing Expressway with the information of the report and the pickup list, registered the driver information, took the seal, checked the identity information and completed the landing nucleic acid detection certificate, etc., so that the materials could successfully arrive at the factory.


During the stay in the factory, the manufacturing center is running at full speed and working overtime, so as not to affect the delivery time of customers due to the epidemic. This puts forward higher requirements for procurement work. In order to make advance quantity, we cooperate with PMC department to adjust raw material production cycle with suppliers in time according to production plan changes. Suppliers are our partners and customers. Under our encouragement and mobilization, the major suppliers also stand together with Sayyas with a more long-term vision, advance and retreat together, under the premise of quality and quantity of expediting production and delivery. When the production line has various abnormalities due to the raw material problem or the arrival of unqualified goods, Yang Fei and I will immediately cooperate with the production line to promote the abnormal solution progress, timely exchange and return goods, and ensure the efficiency through seamless connection.


-- Liu Huanhuan, Purchasing Engineer, Purchasing Department


03 "The wind is choking, straight fight"


In the factory Sayyas man: Have you, have the spirit of striver


Zhu Zhiyong, the material team leader, is responsible for the material and transport work. During the stay in the factory, he can timely and accurately deliver the materials according to the production schedule, and deliver the materials to the packers efficiently and correctly, ensuring the production schedule. Zhu Zhiyong is very warm-hearted. In his spare time, he led a team and took the initiative to fold, deliver, arrange and collect the beds of spray painting materials and other resident staff in the workshop against the north wind in freezing weather for many times, so as to provide convenience for everyone. Zhu Zhiyong is an employee with a high degree of cooperation. He has responsibility, responsibility and dedication no matter what he does inside or outside. He never needs to worry about the assigned work and always finishes it.


-- Wood window a workshop manager that Shusheng


04 Use "simple and rough" to break the monotony of life


In the factory Sayyas man: Have you, have the spirit of striver


Living in the factory has blurred the boundary between production and life, especially for the brothers and sisters in manufacturing. In order to bring joy to everyone as soon as possible under the existing conditions, we chose "simple and rough", and prepared questions and answers with high participation and low threshold, chess and card competition and other activities.


Although the activity you saw was only half an hour in front of the curtain, it required behind-the-scenes work such as preliminary program planning, material preparation, site layout and post-publicity. Although the preparation for each small activity is very trivial, every time I walk around the factory, there are often workers to help without a word, which is really heartwarming.


Every time I stay in the factory, I position myself as a "happy supply station" and a "second line of power". While bringing happiness to my colleagues, I also gained the motivation of "playing music and dancing".


Activity planning and execution is a collective task, I hope all the Sayyas partners can be healthy and full of spirit into life and work.


-- Wu Di, Planner of the Literature Department


05 Generalists evolve into "multiple hands"


In the factory Sayyas man: Have you, have the spirit of striver


During the stay in the factory, there were two host operators of the type machining sequence special-shaped machining group who could not stay in the factory. The leader Sun Nianshan operated two five-axis machining centers of BMG511 and SCM25 for ten days. Input window data size and other information on the 511 operating platform. In the machining process, come to another machining center SCM for corresponding program programming, import feeding, tool change, processing, etc. During the stay in the factory, I worked overtime every day, and finally completed all the processing plans successfully within the construction period. Sun Nianshan joined Sayyas for 20 years, has been not afraid of hardship, not afraid of fatigue, silently willing to contribute, from the side of the workers to the workshop manager, mention his work is praised, worthy of everyone to learn.


-- Lin Lihui, director of the second workshop of Wood Window


06 A model for outstanding young artisans


In the factory Sayyas man: Have you, have the spirit of striver

Zhang Shuang is the cutting master of the pre-processing process, and he has actively applied for the last two times in the factory. Zhang Shuang's wife needed to be taken care of during her pregnancy, so he sent her to his father-in-law's home and devoted himself to front-line work in order to give birth. In addition to handling his own work before completion, Zhang Shuang also undertook process equipment maintenance and process improvement, etc. During his stay in the factory, whenever there is a problem with the equipment, he will rush to the site for maintenance in the first time, so as to ensure the normal operation of the equipment and production in the shortest time.


Zhang Shuang is familiar with many process points of the whole glass line and has comprehensive skills. He has not only performed well in all the craftsman competitions, but also actively learned equipment knowledge and maintenance skills from the workshop manager at ordinary times. He has always been the representative of outstanding young craftsman in the glass production Department.


-- Sun Lingling, Workshop Director of Glass Production Department


07 Aluminum quality inspection post and the "backbone"


In the factory Sayyas man: Have you, have the spirit of striver

Jiang Yongshuang, the leader of aluminum quality team, took the initiative to undertake the work of separation inspection in the case that the separation inspection inspectors could not come to their posts due to the home quarantine of the epidemic. Considering the lack of posts and staff in the separation inspection is related to product quality. Jiang Yongshuang has been working for nearly ten years, and he is very familiar with product series and process points. He not only has rich experience in drawing identification and measurement of special-shaped, sunlight room, bent aluminum, special-shaped steel plate, etc., but also is familiar with installation nodes of various aluminum materials, and can make the material and installation position "clear at a glance". He has inspected each diaphragm window during the entire period of his employment, ensuring delivery schedule and product quality and performing his utmost diligence.


-- Bao Kun, Quality Supervisor of Aluminum Production Department


08 epidemic, let the business trip to form a "closed loop" management


In the factory Sayyas man: Have you, have the spirit of striver


After receiving the order to stay at the factory this time, the Navy, Jianpeng and I returned to Kazakhstan from Nanjing immediately. From the airport to the factory, we achieved a perfect "closed loop" from epidemic prevention requirements to work arrangements.


During this stay in the factory, Jianjie let the planning management fully play the role of "central nervous system", and sales planning and production scheduling, but also spent his 11 years old "son day", very memorable. The Purchasing department ensures supply on the basis of quality and reduces cost on a sustainable basis. Into the installation of fan hardware, put up tents on the production line. Strivers can be seen everywhere, everyone has contributed their full energy, can not be counted. All departments are closely coordinated to ensure stable production. I hope Senying people will continue to unite as one, move forward steadily in prosperity and rise to the challenge in adversity to ensure a perfect ending this year!


-- Zhao Guocai, General Manager of Manufacturing Center



In the factory Sayyas man: Have you, have the spirit of striver

△ A bed in the seam of the wood storage


In the factory Sayyas man: Have you, have the spirit of striver

△ No overtime on Sunday, the second section of the wooden window assembly workers are still working


In the factory Sayyas man: Have you, have the spirit of striver

△ Wood window two paint process Miaomiao get up early to make dumplings


In the factory Sayyas man: Have you, have the spirit of striver

△ The equipment and Engineering Department is carrying out spot inspection and maintenance to ensure the power and energy safety of the plant


In the factory Sayyas man: Have you, have the spirit of striver

△ A neatly folded bed


In the factory Sayyas man: Have you, have the spirit of striver

△ The surprise flash mob brings joy to the strivers stationed at the factory


Tel.

400-6700-999

Address

Address of Shuangcheng factory:


Crossroads of Songhuajiang Road and Xing'an Road, New Industrial Park, Shuangcheng Economic Development Zone, Harbin

Address of Haxi factory:


No. 9, Xinnong Road, Nangang District, Harbin

Address

Address of Nanjing factory:


No. 18, Zhonghuan Road, Jiangning District, Nanjing

Address of Nanjing office building:


Building F, Shimao 52 +, Yuhua District, Nanjing

sayyas1998@126.com

400-6700-999

Online Consultation

wechat

Submit
Now

CITY

AREA

PHONE

CAPTCHA

Shop

JD official flagship store

Tmall official flagship store

Home
Hide