Huizhou urban and rural construction field in the field of green circulation development and energy conservation and consumption reduction special funds declara


Transfer from Huizhou Housing and Urban -Rural Development Bureau


In order to regulate the management of green cycles and energy conservation and consumption reduction in the field of urban and rural construction in Huizhou, and improve the efficiency of financial funds, in accordance with the "Special Fund Management Measures for Green Cycling and Energy Saving Consumption Consumption (Trial) in the field of urban and rural construction in Huizhou (Trial) (Hui Caijian [2022 〕 No. 9) (hereinafter referred to as the "Special Fund Management Measures") and other relevant regulations, formulate this guide.


1. Declaration principle


In order to consider the fund arrangements, adopt the form of independent declaration and expert review, standardize project declaration and review procedures, and improve the standardization and scientific nature of fund arrangements. Enhance the performance concepts of special funds allocation and use, funds declaration, review, and use of funds are guided by performance to strengthen the supervision and management of funds and project implementation.


2. Support objects, conditions and standards


The special funding support items are divided into four categories of 12 small categories: housing building, product production, technology research, and identification evaluation. The specific support methods, objects, conditions and standards are as follows:


(1) House building category


1. Green Building Demonstration Project


(1) Support method: After -after support.

(2) Support object: a consortium led by the construction unit or construction unit.

(3) Support conditions: According to the "GB/T50378)" Guangdong Green Building Evaluation Standard "(DBJ/T15-83) or" Green Industrial Architecture Evaluation Standard "(GB/T50878) The above standard construction has obtained green building signs (non -design signs), and has good social, environmental, economic benefits and leading demonstration effects.

(4) Support standards: According to the construction area, the one -star logo project supports 20 yuan per square meter, and the upper limit of a single project is 500,000 yuan; the two -star logo project supports 50 yuan per square meter. ; The three -star identification project supports 100 yuan per square meter, and the upper limit of a single project is 1 million yuan. The support amount does not exceed 4%of the cost of construction security.


2. Near -zero energy consumption buildings, ultra -low energy consumption (passive) and zero -energy consumption building demonstration projects


(1) Support method: After -after support.

(2) Support object: a consortium led by the construction unit or construction unit.

(3) Support conditions: Constructed in accordance with the "Technical Standards for Near -Zero Energy Consumption" (GB/T51350) and passed the certification of relevant national or Guangdong provincial departments (units). Essence

(4) Support standards: According to the construction area, the ultra -low energy consumption construction project supports 100 yuan per square meter, and the upper limit of a single project supports is 1 million; the nearly zero energy consumption building project supports 150 yuan per square meter, and the upper limit of a single project is 1.5 million yuan; Zero -energy consumption building supports 200 yuan per square meter, and the upper limit of a single project is 2 million yuan. The support amount does not exceed 4%of the cost of construction security.


3. There are existing building energy -saving reconstruction projects (including renewable energy applications, photovoltaic buildings), and existing building green transformation projects


(1) Support method: The existing building energy -saving transformation project (including renewable energy applications, photovoltaic buildings) adopts the support method of the matter and afterwards; the existing building green transformation project is adopted afterwards.

(2) Support object: Energy -saving (green) transformation investment.

(3) Support conditions: The existing buildings are carried out or completed by energy -saving measures through solar photovoltaic, photovoltaic and heat -saving measures. ), Have the role of promotion and demonstration; existing buildings are carried out in accordance with the green transformation of the "Green Reconstruction Evaluation Standard" (GB/T51141).

(4) Support standards: If the existing construction project is being implemented, the energy -saving transformation work, the beneficiary building area supports 10 yuan per square meter, and the upper limit of a single project is 300,000 yuan; if the existing building has completed the energy -saving transformation work, the beneficiary building area is every every building area. The square meter supports 15 yuan, and the upper limit of a single project is 400,000 yuan. Implement "Standards for Green Reconstruction Evaluation of Architecture" (GB/T51141), according to the construction area, the one -star logo project supports 20 yuan per square meter, and the upper limit of a single project is 500,000 yuan; the two -star logo project is supported by 50 per square meter. For yuan, a single project supports the upper limit of 700,000 yuan; the three -star logo project supports 80 yuan per square meter, and the upper limit of the support of a single project is 900,000 yuan. The support amount does not exceed 4%of the cost of construction security.


4. Pre -mixing concrete (pre -mixed mortar) Enterprise green production transformation (construction) project


(1) Support method: After -after support.

(2) Support object: Huizhou pre -mixed concrete production enterprise.

(3) Support conditions: Construction or implementation of technical transformation and upgrading in accordance with the relevant standards of green production (pre -mixed mortar) of pre -mixed concrete (pre -mixed mortar) in the country and Guangdong Province. , Obtained the evaluation of the Green Production Organization of Guangdong Province or higher provincial grades at or above the provincial level.

(4) Support standards: A single project supports 400,000 yuan.


5. Pretending construction project


(1) Support method: support during and afterwards.

(2) Support object: a consortium led by the construction unit or construction unit.

(3) Support conditions: Construction in accordance with the relevant standards of prefabricated buildings in the country and Guangdong Province, and appraised by experts as prefabricated construction projects.

(4) Support standards: obtained as a national prefabricated building demonstration project, a single project supports 2 million yuan; it is rated as the Guangdong prefabricated building demonstration project with a single project of 1 million yuan; If the completion acceptance is recorded, a single project supports 500,000 yuan; after being rated by experts as a prefabricated building project, it has obtained the construction permit of the prefabricated building building building and completed the first floor assembly of the component, and a single project supports 300,000 yuan. If the project is honored in the later period of the national or provincial and prefabricated construction demonstration projects, the application entity can further declare support for support.


6. Building energy consumption monitoring platform project


(1) Support method: After -after support.

(2) Support object: Construction unit of building energy consumption monitoring platform.

(3) Support conditions: The construction of Huizhou is completed within the administrative scope of Huizhou, and the construction energy consumption monitoring platform project with the competent authority accepts the acceptance of the competent department.

(4) Support standards: A single building energy consumption monitoring platform project supports 50,000 to 100,000 yuan (determined according to the construction scale and expert review opinions).


(2) Product production


7. Pretending construction industry base


(1) Support method: After -after support.

(2) Support object: Huizhou enterprises that obtain prefabricated construction industry bases.

(3) Support conditions: With the approval of the national and Guangdong provincial authorities, the title of prefabricated construction industry base is granted, and base demonstration construction is carried out as required.

(4) Support standards: The support amount of the national prefabricated construction industry base is 1 million yuan; the amount of support for the prefabricated construction industry base of Guangdong Province is 500,000 yuan. The Guangdong prefabricated construction industry base was rated as a national prefabricated construction industry base.


8. Green Building Material Project


(1) Support method: After -after support.

(2) Support object: Huizhou enterprises that produce green building materials.

(3) Support conditions: Produced in Huizhou City meet the relevant standards of national or Guangdong Province, and obtain green building materials product certification (green product certification) after evaluation.

(4) Support standards: Green building materials projects that obtain one -star product certification, a single project supports 100,000 yuan; green building materials projects that obtain two -star product certification, a single project supports 200,000 yuan; Building materials projects, a single project supports 300,000 yuan. After technological upgrades and improvement of the green building materials projects, the application entity can further declare support for support. The same enterprise and the same type of green building materials projects are supported only once.


(3) Technical research category


9. Research Project of Energy Conservation and Green Building Technology


(1) Support method: After -after support.

(2) Support object: The main unit of the project is completed.

(3) Support conditions: Research results have reached the level of advanced domestic, innovative, and have independent intellectual property rights or invention patents. Among them, scientific research and development projects have the potential for promotion and application, and the industrial prospects are good. Check the new test, and have the leading effect of scientific and technological innovation.

(4) Support standards: The upper limit of a single technical research project is 800,000 yuan, which does not exceed 30%of the total investment of the project.


10. Construction Energy Conservation and Green Building Standard Formulation Project


(1) Support method: After -after support.

(2) Support objects: dominate or participate in the revision of international, national, industry, and group standards, and enterprise institutions, social groups and industrial alliances registered in Huizhou, or consortium (except for financial allocation units).

(3) Support conditions:

① International Standardized Organization (ISO), International Electricity Commission (IEC), and International Telecommunications Alliance (ITU) and other international standardized organizations confirmed and announced the construction of green development related international standards; Develop relevant national standards and industry standards; ② Guangdong Provincial Housing and Urban -Rural Development Department approved the green development related provincial standards in the field of engineering construction; The industrial alliance was released and the relevant group standards were publicly declared on the relevant standard information platform and the effective implementation of green development related groups in the field of engineering construction; Essence

(4) Support standards: ① Each leading one international standard and support 300,000 yuan; renovation or assistance to formulate, support 150,000 yuan; ② each leading one national standard or industry standard, support 150,000 yuan, revise or or revise or or of If you assist the formulation, support 50,000 yuan; ③ Each leading one provincial and municipal local standards, support 50,000 yuan; ④ For each leading one group standard and effectively implement, support 30,000 yuan; ⑤ For the above 1 to the first to the first to the first to the first to the first to The support of the fourth item, the leading unit of the same project or the participating units cannot be repeatedly declared, and the amount of funds supported by the same year shall not exceed 500,000 yuan in principle in principle.


11. Research projects related to the green development (carbon and carbon neutralization, etc.) in the field of urban and rural construction


(1) Support method: support in the matter.

(2) Support target: third -party consulting institutions for the research of green development (carbon peak carbon neutralization, etc.) in the field of urban and rural construction in Huizhou.

(3) Support conditions: Third -party research institutions determined by the municipal authorities, in accordance with the environmental and climate characteristics of Huizhou, carry out research on carbon peak carbon neutralization in the field of urban and rural construction in Huizhou.

(4) Support standard: The upper limit of a single project is 500,000 yuan.


(4) The identification evaluation class


12. Evaluation of Green Building


(1) Support method: After -after support.

(2) Support object: identify the evaluation agency and construction unit.

(3) Support conditions: The evaluation agencies recognized by the municipal authority and the evaluation of green building logo shall be carried out in accordance with regulations.

(4) Support standards: A single logo item supports 25,000 yuan.


Third, declaration requirements


(1) In principle, the main undertaking unit of investment, development, production, and research is the main body of special funds, and has not violated laws and discipline during the management of special funds and use in the past five years.


(2) The registration place for the registration of housing construction projects and logo evaluation projects should be in Huizhou City, and an enterprise (affairs) industry units of independent legal persons. Projects and hidden dangers shall not be declared.


(3) The main body of product production projects should be in Huizhou City, and enterprises (affairs) industry units that are independent legal persons. They apply for products to produce in Huizhou, and the quality of the product meets relevant national and provincial regulations.


(4) The main body of the application of technical research projects should be an enterprise (affairs) industry units of independent legal persons. The research content should be aimed at the environmental and climate characteristics of Huizhou, carbon peak carbon neutralization in urban and rural construction, or related technical standards to formulate projects. Essence


(5) The application projects shall meet the requirements of relevant national and provincial laws, regulations, and standards. Its projects that have obtained special fund -level fund -level funds have been obtained.


(6) The special fund items that the same actual beneficiaries can apply for the same year must not exceed two items.


Fourth, declaration procedure


(1) Report notice. The Municipal Housing and Urban -Rural Development Bureau determines the "policy tasks" of the annual special funds in accordance with the special fund management measures, this guide and social development. Official channels such as Huizhou Platform have been released publicly to the society, and it is clear that the annual key support category, application time and application materials requirements are clarified.


(2) Project declaration. The application unit prepares the preliminary examination of the sub -construction bureau of the county (district) of the county (district) housing and construction bureau in accordance with the requirements of the project reserves notice. The county (district) housing and construction bureau focused on reviewing the authenticity, integrity, feasibility, compliance of the application materials and issued preliminary opinions. The application unit must be the participating unit of the project, and must not entrust a third party to be the project application unit.


(3) Expert review. After the deadline for the application of special fund project reserves, the Municipal Housing and Urban -Rural Development Bureau organized no less than 5 (single) experts to review in time. The review expert group gave scientific and rigorous review opinions based on the project application materials to clarify whether the project recommended reserves were recommended Library. To determine the projects of reserves, the expert group needs to sort according to the project's social demonstration effect and environmental impact level, and initially determine the order of support and support of the reserve project.


(3) Recommended storage. The Municipal Housing and Urban -Rural Development Bureau will determine the list of annual intended reserves in accordance with the special fund management measures and guidelines, and combine the conclusions of the expert review and the credit information of the application unit. The review opinions are "not recommended" projects, which are not included in the list of annual reserve entry projects; the review opinions are "recommended" but not included in the list of projects to be stored in the year. The annual application reserve project has re -evaluated and sorted it until the support of special funding. The application unit does not need to repeatedly submit the application materials.


(3) Project publicity. The Municipal Housing and Urban -Rural Development Bureau solicited the opinions of the relevant administrative functional departments and publicized it to the public on the list of projects to be stored in the year. After the publicity period expires, the Municipal Housing and Urban -Rural Development Bureau will include the projects that have no objections and inconsistent objections to the annual reserve entry project, and formulate annual special fund support plans, and conduct approval and compile annual special funds in accordance with the special fund management measures. Budget.


(4) Fund allocation. After the annual special fund budget was approved by the Municipal People's Congress, the municipal competent authorities formulated the annual budget expenditure plan and the actual project of the project. Projects that adopt post -after -support methods shall be allocated by the Municipal Housing and Urban -Rural Development Bureau at one time; projects that support the support methods shall allocate support funds by the Municipal Housing and Urban -Rural Development Agency in accordance with the project agreement and project progress. The Municipal Housing and Urban -Rural Development Bureau allocated special funds to the application unit or the application unit in accordance with the relevant provisions of the financial payment management.


5. Supervision and management


(1) Special funds accept social supervision and implement the objection system. During the publicity of the list of storage projects, any unit and individual have objections, and may be submitted to the competent authorities. The competent department shall conduct investigations and issue a conclusion of investigation. Acceptance and processing of objection (including complaint matters and reasons, complaint handling, etc.) shall be made public on the official website of the competent department.


(2) The project performance goals are clearly proposed during the project application, including and are not limited to demonstration content, technical measures, innovative content, promotion value, and comprehensive benefits analysis. Project performance target settings should be reasonable and feasible, and the combination of quantitative indicators and qualitative expressions should be adopted. Projects that fail to explain performance targets as required, shall not be included in the list of projects to be reserved.


(3) The application project that adopts the support method in the matter should be implemented in strict accordance with the content of the project application project to be included in the project. Require.


(4) After the special funds are allocated, the competent authorities at all levels shall organize the use of funds to carry out performance self -assessment work to provide important references for the next year's special fund budget arrangements, policy adjustments, and fund distribution.


(5) During the supervision of the implementation of the application project, the competent authority finds that there are the following circumstances if there is a situation, and measures should be taken in time to ensure the safety of special funds:


1. The application unit has fraudulent falsification, fraudulent special funds, and severe dishonesty, the competent department stops subsequent funds allocation, recover all special funds and interests, and transfer the corporate illegal information to the relevant departments for further processing, and shall not apply for the special special within 3 years. funds.

2. If the items that are supported in the event, if the project cannot continue to be implemented due to force majeure factors, the competent authority stops subsequent funds allocation; if the implementation of the performance goals, and the results of the results and performance goals, Dialing and recovering all special funds and interests, the circumstances are seriously reported by the competent authority to report the relevant enterprises' bad credit competent authorities. Special funds shall not be declared within 3 years.


Tel.

400-6700-999

Address

Address of Shuangcheng factory:


Crossroads of Songhuajiang Road and Xing'an Road, New Industrial Park, Shuangcheng Economic Development Zone, Harbin

Address of Haxi factory:


No. 9, Xinnong Road, Nangang District, Harbin

Address

Address of Nanjing factory:


No. 18, Zhonghuan Road, Jiangning District, Nanjing

Address of Nanjing office building:


Building F, Shimao 52 +, Yuhua District, Nanjing

sayyas1998@126.com

400-6700-999

Online Consultation

wechat

Submit
Now

CITY

AREA

PHONE

CAPTCHA

Shop

JD official flagship store

Tmall official flagship store

Home
Hide